KKG/INSTALL · FRAMES & GLAZING · PERTH WA · EST. 2020
Document № 001 · Installation

One crew. Frames and glazing.

Window & door frame installation and glazing lockup for residential new builds across Perth. We fix the frames at frame stage and come back for lockup when your glass lands — one subbie handling both stages, so you're not coordinating two trades for one opening.

Talk to us
— Specifications V1.0
Experience 4+ years on-site
Crew 2-person, every job
Construction Timber · single & double storey
Glazing Single & double glaze
Scheduling Weekends available
Coverage Perth metro
ABN 91 970 542 709 EST. 2020
The problem
№ 02 / 05

Two trades for one opening costs real money.

— THE USUAL WAY
One trade fixes frames. Another installs glass.

Two bookings to make. Two crews to induct. Two schedules that have to line up with your build stage and your glass delivery — and when one slips, the other sits idle or gets rebooked. Every handover between trades is a place for defects to hide.

— THE KERO INSTALL WAY
One crew owns the opening, start to finish.

We install the frames, and we're the same crew that comes back for lockup. One contact, one induction, one point of accountability. If our install's out at lockup, there's no other trade to chase — it's our work, and we make it right.

Services
№ 03 / 05

Frames, lockup, or both.

— 01

Frame installation.

Window and door frames installed on timber-framed homes — square, plumb and fixed to spec, ready for glazing.

  • Single & double storey
  • Timber framing · steel on request
  • 2-person crew for safe upper-floor lifts
— 02

Glazing lockup.

Single and double glaze installation to windows and doors when your glass is delivered — building locked up behind us.

  • Single & double glaze
  • Windows & glazed doors
  • Locked up, ready for next trades
— 03

Combined package.

Frames at frame stage, lockup when the glass lands — both visits scheduled around your supply timeline, handled by the same crew.

  • One booking, two visits
  • No trade-to-trade handover risk
  • Ideal overflow capacity for suppliers
Process
№ 04 / 05

Booked to locked up in four steps.

1
Scope & quote

Send the plans or window schedule. We confirm frame count, glazing spec and dates — quote back within 24 hours.

2
Frame stage

Frames installed at frame stage, square and plumb. Upper floors handled by our standard 2-person crew.

3
Lockup

When glass is delivered we return for installation. Building locked up — no coordination between separate trades.

4
Sign-off

Walk-through against the window schedule. Workmanship issues are fixed on the spot — supply problems get reported straight back to you.

Kero Install is a division of Kero Group — operating alongside Klean and doKs under one standard: do the work properly, communicate clearly, deliver on time.

Contact
№ 05 / 05

Send us your window schedule.

Quote back in 24 hours.

Window supplier, builder or site supervisor — send the plans or window schedule and we'll come back with a quote and available dates.

Phone 0487 336 174
WhatsApp Chat with us →
— Request a quote